Abstract:
The aim of this study is to rid the soil of about 1,500 tons of ammonia (ammonia) produced annually from the Khartoum oil refinery in Jili, which is currently in desert land in the Jili area, which is prone to soil, human and animal risk of pollution and poisoning.